Electrical Panel Lockout

Lockout Tagout Devices

Installation Instructions

STEP ONE

« Back to Album Photo 1 of 5 Previous | Next
STEP ONE
Turn off the breakers for the circuits that will be worked on. Loosen two screws a couple of turns.
Posted by panellockout on July 21, 2009 Full Size| Slideshow